Following the finalisation of the kitchen design and it’s subsequent ordering, we have begun the
preparation work for the removal of the existing kitchen. We have also begun removing the wall
between the kitchen and dining room, to prepare the open plan area which consisted off:
- Installing a new beam as per the structural engineer’s advisement
- Renewal and re-site of boiler
- Rewiring kitchen including sockets and lighting
- Plastering of walls and ceiling